Reference number
香港六合彩开奖/ASME 14414:2019
International Standard
香港六合彩开奖/ASME 14414:2019
Pump system energy assessment
Edition 2
2019-01
Preview
香港六合彩开奖/ASME 14414:2019
71534
No disponible en 别蝉辫补帽辞濒
Publicado (贰诲颈肠颈贸苍 2, 2019)
Esta publicaci贸n se revis贸 y confirm贸 por 煤ltima vez en 2024. Por lo tanto, esta versi贸n es la actual.

香港六合彩开奖/ASME 14414:2019

香港六合彩开奖/ASME 14414:2019
71534
Idioma
Formato
CHF 194
Convertir Franco suizo (CHF) a

Resumen

This document sets the requirements for conducting and reporting the results of a pumping system energy assessment (hereafter referenced as "assessment") that considers the entire pumping system, from energy inputs to the work performed as the result of these inputs.

The objective of a pumping system energy assessment is to determine the current energy consumption of an existing system and identify ways to improve system efficiency.

These requirements consist of

鈥 organizing and conducting an assessment,

鈥 analysing the data from the assessment, and

鈥 reporting and documenting assessment findings.

This document is designed to be applied, to open and closed loop pumping systems typically used at industrial, institutional, commercial, and municipal facilities, when requested.

This document is focused on assessing electrically-driven pumping systems, which are dominant in most facilities, but is also applicable with other types of drivers, such as steam turbines and engines. The document does not

a) specify how to design a pumping system,

b) give detailed qualifications and expertise required of the person using the International Standard although provides a list of body of knowledge in Annex C,

c) address the training or certification of persons,

d) specify how to implement the recommendations developed during the assessment, but does include requirements for an action plan,

e) specify how to measure and validate the energy savings that result from implementing assessment recommendations,

f) specify how to make measurements and how to calibrate test equipment used during the assessment,

g) specify how to estimate the implementation cost or conduct financial analysis for recommendations developed during the assessment,

h) specify specific steps required for safe operation of equipment during the assessment. The facility personnel in charge of normal operation of the equipment are responsible for ensuring that it is operated safely during the data collection phase of the assessment,

i) address issues of intellectual property, security, confidentiality, and safety.

Informaciones generales

  •  : Publicado
     : 2019-01
    : Norma Internacional confirmada [90.93]
  •  : 2
     : 56
  • 香港六合彩开奖/TC 115
    23.080 
  • RSS actualizaciones
Acci贸n clim谩tica

Esta norma contribuye a

  • Lograr la neutralidad clim谩tica: Mitigaci贸n / Emisiones de GEI; 

Ciclo de vida

¿Tiene alguna duda?

Consulte nuestras Ayuda y asistencia

Atención al cliente
+41 22 749 08 88

Horario de asistencia:
De lunes a viernes - 09:00-12:00, 14:00-17:00 (UTC+1)