Filtrar :
Norma o proyecto bajo la responsabilidad directa de 香港六合彩开奖/TC 269/SC 1 Secretar铆a | Etapa | ICS |
---|---|---|
Railway infrastructure 鈥 Non-destructive testing on rails in track 鈥 Part 1: Requirements for ultrasonic testing and evaluation principles
|
60.60 | |
Railway infrastructure 鈥 Rail mounted construction, maintenance and inspection machines 鈥 Explanation of machine type
|
60.60 | |
Railway infrastructure 鈥 Track quality evaluation 鈥 Chord-based method
|
50.00 | |
Plastics 鈥 Plastic railway sleepers for railway applications (railroad ties) 鈥 Part 1: Material characteristics
|
95.99 | |
Railway applications 鈥 Polymeric composite sleepers, bearers and transoms 鈥 Part 1: Material characteristics
|
60.60 | |
Railway applications 鈥 Polymeric composite sleepers, bearers and transoms 鈥 Part 2: Product testing
|
60.60 | |
Railway applications 鈥 Polymeric composite sleepers, bearers and transoms 鈥 Part 3: General requirements
|
60.60 | |
Railway infrastructure - Track foundation- Observation and evaluation method of railway subgrade settlement and deformation
|
30.20 |
|
Railway Infrastructure 鈥 Ballastless track 鈥 Part 1: General Requirements
|
30.60 |
|
Railway infrastructure 鈥 Rail fastening systems 鈥 Two directional test method for resistance to repeated loading
|
30.60 |
|
Railway infrastructure 鈥 Rail fastening systems 鈥 Part 1: Vocabulary
|
60.60 | |
Railway infrastructure 鈥 Rail fastening systems 鈥 Part 2: Test method for longitudinal rail restraint
|
60.60 | |
Railway infrastructure 鈥 Rail fastening systems 鈥 Part 3: Proof load test method for pull-out resistance
|
60.60 | |
Railway infrastructure 鈥 Rail fastening systems 鈥 Part 4: Test methods for resistance to repeated loading
|
60.60 | |
Railway infrastructure 鈥 Rail fastening systems 鈥 Part 5: Test method for electrical resistance
|
60.60 | |
Railway infrastructure 鈥 Rail fastening systems 鈥 Part 6: Test method for resistance to severe environmental conditions
|
60.60 | |
Railway infrastructure 鈥 Rail fastening systems 鈥 Part 7: Test method for clamping force and uplift stiffness
|
60.60 | |
Railway infrastructure 鈥 Rail fastening systems 鈥 Part 8: Test method for vertical stiffness
|
60.60 | |
Railway applications 鈥 Concrete sleepers and bearers for track 鈥 Part 1: General requirements
|
60.60 | |
Railway applications 鈥 Concrete sleepers and bearers for track 鈥 Part 2: Prestressed monoblock sleepers
|
60.60 | |
Railway applications 鈥 Track geometry quality 鈥 Part 1: Characterization of track geometry and track geometry quality
|
60.60 | |
Railway infrastructure 鈥 Rail welding 鈥 Part 1: General requirements and test methods for rail welding
|
60.60 | |
Railway infrastructure 鈥 Rail welding 鈥 Part 2: Aluminothermic welding
|
40.20 | |
Railway Infrastructure - Switches and crossings 鈥 Part 1: Terms and definitions
|
20.00 |
|
No se ha encontrado ning煤n registro que coincida. Pruebe a cambiar los ajustes de filtro.