Filtrar :
Norma o proyecto bajo la responsabilidad directa de 香港六合彩开奖/TC 67/SC 9 Secretar铆a | Etapa | ICS |
---|---|---|
Loading and unloading of liquefied natural gas (LNG) tank wagons and containers
|
60.00 | |
Calculations of greenhouse gas (GHG) emissions throughout the liquefied natural gas (LNG) chain 鈥 Part 1: General
|
60.60 | |
Calculations of greenhouse gas (GHG) emissions throughout the liquefied natural gas (LNG) chain 鈥 Part 2: Natural gas production and transport to LNG plant
|
60.60 | |
Method to calculate GHG emissions at LNG plant
|
60.60 | |
Guidance on performing risk assessment in the design of onshore LNG installations including the ship/shore interface
|
95.99 | |
Guidance on performing risk assessment in the design of onshore LNG installations including the ship/shore interface
|
60.60 | |
Petroleum and natural gas industries 鈥 Characteristics of LNG, influencing the design, and material selection
|
90.93 | |
Installation and equipment for liquefied natural gas 鈥 Design and testing of marine transfer systems 鈥 Part 2: Design and testing of transfer hoses
|
60.60 | |
Petroleum and natural gas industries 鈥 Design and testing of LNG marine transfer arms for conventional onshore terminals
|
90.93 | |
Petroleum and natural gas industries 鈥 Guidelines for the marine interfaces of hybrid LNG terminals
|
90.93 | |
Guidelines for systems and installations for supply of LNG as fuel to ships
|
95.99 | |
Guidelines for safety and risk assessment of LNG fuel bunkering operations
|
60.60 | |
Determination of the resistance to cryogenic spillage of insulation materials 鈥 Part 1: Liquid phase
|
90.93 | |
Determination of the resistance to cryogenic spill of insulation materials 鈥 Part 2: Vapour exposure
|
60.60 | |
Determination of the resistance to cryogenic spillage of insulation materials 鈥 Part 3: Jet release
|
90.93 | |
Installation and equipment for liquefied natural gas 鈥 Design of floating LNG installations 鈥 Part 1: General requirements
|
60.60 | |
Installation and equipment for liquefied natural gas 鈥 Design of floating LNG installations 鈥 Part 2: Specific FSRU issues
|
60.60 | |
Design, construction and testing of high-pressure gas transfer systems
|
20.98 |
|
Petroleum and natural gas industries 鈥 Installation and equipment for liquefied natural gas 鈥 Ship-to-shore interface and port operations
|
90.93 |
No se ha encontrado ning煤n registro que coincida. Pruebe a cambiar los ajustes de filtro.