Abstract
Ïã¸ÛÁùºÏ²Ê¿ª½± 5149-3:2014 is applicable to the installation site (plant space and services). It specifies requirements for the site for safety, which could be needed because of, but not directly connected with, the refrigerating system and its ancillary components.
Ïã¸ÛÁùºÏ²Ê¿ª½± 5149-3:2014 is applicable to new refrigerating systems, extensions or modifications of existing systems, and for used systems being transferred to and operated on another site. It also applies in the case of the conversion of a system for another refrigerant.
General information
-
Status: PublishedPublication date: 2014-04Stage: International Standard to be revised [90.92]
-
Edition: 1Number of pages: 14
-
Technical Committee :Ïã¸ÛÁùºÏ²Ê¿ª½±/TC 86/SC 1
- RSS updates
Amendments
Amendments are issued when it is found that new material may need to be added to an existing standardization document. They may also include editorial or technical corrections to be applied to the existing document.
Amendment 1
Update of the requirements for machinery rooms and emergency mechanical ventilation
Edition 2021
Next version under development
Ïã¸ÛÁùºÏ²Ê¿ª½±/DIS 5149-3
Refrigerating systems and heat pumps — Safety and environmental requirements
Part 3: Installation site
Ïã¸ÛÁùºÏ²Ê¿ª½±/DIS 5149-3
Life cycle
-
Previously
WithdrawnÏã¸ÛÁùºÏ²Ê¿ª½± 5149:1993
-
Now
PublishedÏã¸ÛÁùºÏ²Ê¿ª½± 5149-3:2014
A standard is reviewed every 5 years
Stage: 90.92 (To be revised)-
00
Preliminary
-
10
Proposal
-
20
Preparatory
-
30
Committee
-
40
Enquiry
-
50
Approval
-
60
Publication
-
90
Review
-
95
Withdrawal
Amendments
Provide additional content; available for purchase; not included in the text of the existing standard.PublishedÏã¸ÛÁùºÏ²Ê¿ª½± 5149-3:2014/Amd 1:2021
-
00
-
Will be replaced by
Under developmentÏã¸ÛÁùºÏ²Ê¿ª½±/DIS 5149-3
Opening hours:
Monday to Friday - 09:00-12:00, 14:00-17:00 (UTC+1)